Concrete Chimney

Case Study: Bellary Thermal Power Station

Bellary Thermal Power Station   |  Kudatini, Bellary – Karnataka

INTRODUCTION

Bygging has successfully completed the design and construction of 275M RCC chimney with brick liner and including all civil, electrical & elevator work for Unit-3 for Bellary Thermal Power station.

During the construction, Bygging was awarded a certificate of achievement for outstanding efforts in delivering the project with Zero Accident.

Scope of Work:

  • Chimney Raft Foundation
  • Chimney Shell
  • Brick Lining
  • Hopper
  • Platform & Painting
  • Electrical
  • Ladder & Handrails

Technical Data:

    • Height of Shell
    • No. of Flues
    • Type of Flues
    • Shell Bottom OD
    • Shell Bottom Thickness
    • Shell Top OD
    • Shell Top Thickness
    • 275 M
    • 1
    • Brick
    • 26.8 M
    • 0.900 M
    • 8.65 M
    • 0.310 M

     

Concrete Chimney Liners