Ë

Other structures

Case Study: Civil Works for Air Cooled Condenser

North Karanpura Super Thermal Power Plant Project   |  Chatra - Jharkhand

INTRODUCTION

Bygging executed a civil works project that included 38 air cooled condenser (ACC) columns for North Karanpura Super Thermal Power Project. ACC columns are hollow circular concrete cylinders on which the ACC will be installed. The project was awarded by BHEL (Bharat Heavy Electricals Limited) a first of its kind project which is using air cooled condensers instead of NDCT/IDCT.

Technical Data:

    • Height of Air Cooled Condenser
    • Number of ACC Columns
    • Outer Diameter
    • Inner Diameter
    • Thickness
    • Earthwork
    • Concrete Quantity
    • Shuttering
    • Completion Time
    • 54.80 M
       
    • 38
    • 5.5 M
    • 4.4 M
    • 0.55 M
    • 88039 M³
    • 38000 M³
    • 74480 M²
    • 20 Months

     